Our Projects

FPSO BW Maromba

TUFF provided EPCIC services for the FPSO BW Maromba project, ensuring vessel readiness for Maromba field development through inspections, engineering, and project management.

Consultancy

Design

Project Overview

The FPSO BW Maromba project involves a comprehensive range of services, including condition assessment, development of codes and standards, and detailed engineering. The goal is to ensure the suitability and effectiveness of the FPSO for Maromba field development.

Project Details

The FPSO BW Maromba project entails thorough inspection and reporting on various components and systems. This includes over 1800 lines inspected, 400+ pieces of equipment evaluated, and extensive NDT and UTM tasks. The project also involves creating a central file database, developing inspection plans and checklists, and conducting detailed engineering and design tasks to ensure the vessel meets all necessary standards and requirements.

Scope of Work

  • Conducted condition assessment with over 1800 lines and 400+ pieces of equipment inspected, including static and rotating equipment.
  • Performed detailed inspections such as UTM on 59 vessels/heaters and NDT on primary and secondary structures.
  • Developed RLE, demolition, conversion, and accommodation scopes of work based on assessments and reviews.
  • Created piping ISOs, MTOs, and inspected electrical motors and field instruments.
  • Completed ABS pre-condition survey and NORM removal from slops.
  • Generated customized inspection plans, checklists, and suitability assessment matrices for ICSS systems and marine suitability.
  • Developed codes and standards, and established a central file database.
  • Conducted pre-bid engineering, FEED verification, detail engineering, process simulation, safety studies, and 3D modeling.

Conclusion

The FPSO BW Maromba project highlights TUFF's expertise in delivering comprehensive and integrated solutions for the oil and gas sector. Through meticulous inspections, detailed engineering, and robust project management, TUFF ensures the FPSO is fully prepared for effective operation in the Maromba field, demonstrating a commitment to safety, quality, and efficiency.

Got a project to discuss?

Connect with our team to explore how we can support your industrial project needs.

Thank you for your enquiry! We’ll contact you soon.
Oops! Something went wrong while submitting the form.